The project was to expand a glass manufacturing facility and install the corresponding above ground and below ground conveyance systems. The below
ground conveyance system required a large amount of excavation and the construction of 250 feet of 12-foot deep tunnel. It all had to be done
without a single shutdown... CLICK HERE TO READ THE ENTIRE PROJECT OVERVIEW >>
• 250 feet of 12-foot deep tunnel
• Below ground and above ground conveyors
• 4,500 cubic yards of excavation inside an operational manufacturing plant
• Shoring span of 50 feet to support roof
• 5,000+ man hours, 87 days, no plant shutdowns
• No lost time injuries