The project was to install a new processing pit measuring 40 feet long by 20 feet wide by 22 feet deep along with the associated structure and controls in the middle of a facility that processes molten metal... CLICK HERE TO READ THE ENTIRE PROJECT OVERVIEW >>
• Design-build, engineering under our contract
• Accelerated schedule, six 10-hour shifts and night shifts as required to work around plant operations
• Five gases extended to new control manifold; air, nitrogen, argon, natural gas, and high purity oxygen
• New 40-ton and 75-ton overhead cranes
• 3,700 Man hours
• No recordable incidents
• On schedule, below budget